www.cablex.ch
cablex AG | Tannackerstrasse 7 | 3073 Gümligen |

30/09/2020  /  Carolin Primerova
news

Best-of Ceneri.

Now that the Ceneri Base Tunnel has been put into operation, the New Railway Link through the Alps (NRLA) is complete. The continuous flat-rail route from Altdorf to Lugano would not have become a reality without the 15.4 km base tunnel under the Ceneri. On 31 August 2020, the Ceneri Base Tunnel was handed over to Swiss Federal Railways right on schedule. And with that, the operator SBB is now the owner of the Ceneri Base Tunnel. This milestone draws cablex's largest ever technology project to a close after five and a half years. A good time, then, to take a look back and review the most important phases for cablex.

facebook Google Plus Whatsapp RSS


The Ceneri Base Tunnel project.

A large tunnel building project such as the Ceneri Base Tunnel presents both challenges and opportunities for innovation and agility in the construction sector. Digitisation is becoming increasingly widespread in the infrastructure sector. Hence the Ceneri Base Tunnel project also makes use of the added value that can be provided by new technologies and methods. Thanks to the interdisciplinary team, open and honest error handling and our employees' high level of motivation, we can overcome the challenges of this project with innovative ideas.

 


More videos about the Ceneri Base Tunnel.

cablex AG | Tannackerstrasse 7 | 3073 Gümligen | Phone 0848 222 539 | cablex.info@cablex.ch