The four Birchi, Lüsslingen, Spitalhof and Witi tunnels on the A5 between Lengnau and Luterbach are being renewed. The FEDRO awarded the contract for the renewal of the tunnel lighting to cablex. Urs Waldner and his team are working flat out.

12.12.2022
Author Carolin Rabea Primerova

New tunnel lighting requires night work.

cablex is installing the new lighting in four tunnels on the A5 for its client, the Federal Roads Office (FEDRO). This includes installing the cable route, laying the supply lines from the control centre to the road area as well as installing and connecting the new lighting, the optical guidance system (cat's eyes on the carriageway) and the emergency fire lighting. The latter will now only be installed on the side offering access to the escape route. This will help people to safely find their way to the escape route in the event of a fire.

 

The cablex contract essentially comprises:

Lighting

  • Installation and connection of adaptation, drive-through, fire emergency, escape route and service duct lighting as well as the optical guidance system.

 

Signalling

  • Supply, installation, cabling, connection and dismantling of the green flashing and bar lights at the emergency exits.
  • Monitoring systems
  • Communication and control technology
  • Cable systems
  • Various dismantling of existing installations

 

 

 

Interim review of the major project Control Unit Replacement.

Since 2019, cablex has replaced 220 control units and around 2800 associated traffic lights.

cablex is investing in the future of public works.

With the measures being taken in the Deisswil competence centre, cablex wants to take expertise in the construction segment to the next level.

Hardware Rollout at CONCORDIA.

The cablex customer promise was realised in full for CONCORDIA.

Transport.

Creating a future-proof infrastructure with cablex.

Männer im Tunnel auf Hebebühne

The four-tunnel project on the A5.

Installing the cable route, installing the cables, installing the lamps. cablex is installing the new tunnel lighting for FEDRO at night.

Wide-scale migration launched at Coop.

57 cablex technicians at work for Coop.

Mann beim Kabelzug

Traffic light system must make way for new bicycle tunnel.

In order to build the ramp to enter the new bicycle tunnel, a control unit for the traffic lights at Zurich's main station must be relocated.

smart cablex.

In our Smart Building, Smart City, Smart Construction and innovation, we implement innovative and forward-looking solutions for you.

cablex Academy.

The cablex Academy teaches specialist skills (competences) in the fields of network construction, service and installation. Here, focus is on the area of network construction for telecommunication.

Safety training in beautiful Grisons.

Internal safety training was held again last week in Meiersboden, Canton Grisons. The beautiful autumn day and the location close to the Grisons mountains were an additional invitation to do practical exercises outside.

Half of PTP distribution box gutted by fire!

Burnt out PTP distribution box was quickly brought back into operation.

cablex AG

Tannackerstrasse 7

3073 Gümligen

cablex.info@cablex.ch

0800 222 444