cx_0223_16-9.jpg

cablex News – The latest stories on network infrastructure and service.

We keep you informed about the wide range of services that we provide to our customers around-the-clock.

133 news articles

Re-appointment of the position of Chief Information Security Officer.

After two months in office, Manuel Ziegler answered our questions about his new role at cablex:

14.03.2023 von Martina Strazzer
Techniker installiert Zähler

Complete package: produce electricity sustainably and save costs.

Cablex shows why a merger as a self-consumption initiative (ZEV) is worthwhile both for tenants and landlords.

09.03.2023 von Carolin Rabea Primerova

New team member for overhead lines: the crane trailer.

The red Ferrari among overhead lines, also known as a crane trailer, takes care of loading and erecting pylons, making daily work in the field easier.

23.02.2023 von Larissa Mihalik
Lehrling am Spleissen

Attractive apprenticeships at cablex!

Specialist at cablex for first-class network infrastructure solutions.

07.02.2023 von Martina Strazzer

Interim review of the major project Control Unit Replacement.

Since 2019, cablex has replaced 220 control units and around 2800 associated traffic lights.

02.02.2023 von Carolin Rabea Primerova

Brienz-Brinzauls slides and causes disruption.

Brienz-Brinzauls is a village with around 110 inhabitants that is moving towards the valley.

25.01.2023 von Larissa Mihalik
Kompetenzzentrum Deisswil

cablex is investing in the future of public works.

With the measures being taken in the Deisswil competence centre, cablex wants to take expertise in the construction segment to the next level.

10.01.2023 von Carolin Rabea Primerova

Hardware Rollout at CONCORDIA.

The cablex customer promise was realised in full for CONCORDIA.

09.01.2023 von Martina Strazzer

Santa Claus on a mission: the cablex Christmas story 2022.

When Santa Claus checks the orders during this year’s gift check, he is shocked to discover that he has completely forgotten about the 2500 presents for cablex!

14.12.2022 von Larissa Mihalik
Männer im Tunnel auf Hebebühne

New tunnel lighting requires night work.

Installing the cable route, installing the cables, installing the lamps. cablex is installing the new tunnel lighting for FEDRO at night.

12.12.2022 von Carolin Rabea Primerova

cablex AG

Tannackerstrasse 7

3073 Gümligen

cablex.info@cablex.ch

0800 222 444