Fistbump - 16-9

cablex is close at hand.

Get in touch with us – we would be happy to advise you.

Thank you for contacting us.

We will deal with your request as quickly as possible.

Advice.

If you need advice on what we can offer you, please get in touch with our key account managers and they will be happy to assist you.

cablex Techniker vor Shell-Ladestation

Reference project for evpass AG: fast charging at Lake Thun

Installing EV charging infrastructure on third-party property is rarely straightforward. In Hünibach, cablex delivered two 66 kW fast chargers for evpass AG: direct grid connection, 42-metre crane, single-source project responsibility.

Carolin Rabea Primerova 1-1
Signalmontage-16x9

Signal installation at Honeret: what takes shape behind the barriers.

For nine years, cablex has been renewing the Northern Bypass of Zurich — night after night, section by section. A look into the Honeret section.

Carolin Rabea Primerova 1-1
BUB-3x4

An infrastructure modernisation project with a vision for the future.

Bubenholz tunnel: cablex modernises the lighting in parallel with live operations – no disruption, future-proof ahead of the 2030 refurbishment.

Carolin Rabea Primerova 1-1
Zwei cablex Techniker beim Firmenwagen.

Fibre-optic power for your home.

Fast, uninterrupted Internet, digital television in top quality, and a reliable home office setup – optical fibre makes all this possible. On behalf of Swisscom, cablex brings this pioneering technology directly to your home.

Copper Harvest 24-9

Copper has had its day – Switzerland is switching over.

cablex is turning the tables: instead of laying new lines, our teams are pulling old copper cables out of the ground throughout Switzerland.

Larissa Mihalik 1-1
25 Jahre cablex

25 years of cablex – our anniversary year 2026 begins.

cablex celebrates 25 years of innovation, expertise and strong partnerships. Thank you for your trust!

Roger Keller, CEO bei cablex
cablex Techniker steht auf dem Dach mit den verlegten Solarpaneelen.

Solar energy for the future: successful installation on the WMO building.

The extensive installation of 198 solar panels on the WMO building in Geneva offers a capacity of 92 kilowatts and contributes to a sustainable power supply.

Martina Strazzer 1-1
Elektrischer LKW vor einer Ladestation

Construction of charging infrastructure for cars and HGVs.

cablex installs your charging infrastructure professionally – with practical examples that make technical and economic options transparent.

cablex technician works in a local exchange.

Telecom & IT

Implement future-proof holistic solutions in the ICT sector with cablex.

Safety Schulungen Lernende 24-9

A safe start to working life – our safety training courses for apprentices.

Starting a career not only brings new opportunities and prospects, but also responsibility. Safety is a key issue, particularly in network construction and when working with electricity.

Larissa Mihalik 1-1
Header Mastkontrolle 24-9

Almost 100 years in the wind and weather - in search of the oldest mast.

Storm, hail, snow and blistering heat – they defy them all. We are talking about the inconspicuous heroes of Swiss telecommunications: wooden masts that keep the network running even in the most remote regions.

Larissa Mihalik 1-1

cablex AG

Tannackerstrasse 7

3073 Gümligen

cablex.info@cablex.ch

0800 222 444