E2E-16-9.jpg

The interface in the end-to-end process.

Many pieces fall together in Engineering: the jobs from Swisscom, the needs of the end customer and implementation/realisation planning out in the field. If Engineering does not plan right, then the installation technicians lack the information they need to build a high-quality network. Patrick Kunz is Head of Engineering at cablex in the Wireline Construction unit. He provides insight into the key areas of responsibility and the role of Engineering in the end-to-end process.

30.09.2021
Author Carolin Rabea Primerova

Die Schnittstelle im End-to-End Prozess.

Joy and pride – 17 apprentices have passed their final exams!

Fifteen apprentices will continue to work at cablex.

Indoor radio coverage for a frozen food centre!

A comprehensive catalogue of requirements for the indoor radio coverage.

cablex at the Greenfield Festival 2022.

cablex technical team responsible for the Internet infrastructure at the Greenfield Festival 2022.

DSC_8480_24-9.jpg

Electrician EFZ.

No matter whether it's for electricity, telephony, Internet or television/radio in commercial or industrial buildings, you as an installation professional bring this nervous system in buildings to life!

Women power in Western Switzerland.

Providing effective customer support with high female representation on our technical team.

Good reasons for an apprenticeship as a network electrician.

Future network electrician professionals with a focus on telecommunications studied hard for four days in Kallnach.

New prospects thanks to internal training.

cablex trains its employees to become versatile specialists.

Montage_elektriker_24-9.jpg

Assembly electrician.

No matter whether it's for for electricity, telephony, Internet or television/radio in commercial or industrial buildings - as an assembly professional, you have all the connections firmly under control!

Network electricians EFZ.

Digitalisation, social media, virtual worlds, homeschooling, smart home systems - are only possible with you as a network construction professional!

Header Kallnach ÜK TEL 3 24-9.jpg

ICC TEL 3 – the last industry-wide training course before the qualification process.

The third-year network electrician apprentices met at the BKW training centre in Kallnach in November 2021.

Mastrettung-24-9-neu.jpg

Simulation of an accident scenario on a mobile phone mast.

To ensure that the rescue of an injured person from a radio mast is carried out safely and routinely, the employees are prepared for these extreme situations.

cablex AG

Tannackerstrasse 7

3073 Gümligen

cablex.info@cablex.ch

0848 222 539